Mechanical, Electrical and Plumbing system modeling
Detailed installation and fabrication drawings provide a plan for when construction time begins
MEP Coordination management and construction model clash detection.
five-story, 200,000-square-foot, cast-in-place and structural steel medical office building with a two-story, 161,000-square-foot precast parking deck on a 10 acre site. The building will have an ambulatory service center on the 5th floor and imaging on the 1st floor.
$24M ATCT and TRACON facility at RSW. The ATCT will be approximately 205 feet above grade and will have an associated 15,500 sf TRACON.
A new 48,000-square-foot public safety building under construction in Currituck County. The $23.4 million facility will house the sheriff’s office, fire and emergency management officials, emergency medical services, the 911 center, and state forest rangers.
The three-story building will house a gallery, a lecture hall and classrooms and studios for various types of art studies. $50.5 million
Client: Old Dominion University
Location: Norfolk, VA
Discipline: Residence Life
Completion: 2019
Size: 165,000 SF
85,000 sq. ft. facility is home to several of VDOT’s Richmond District departments, including VDOT’s Richmond Traffic Operations Center and VSP’s Richmond Division Emergency Communications Center
New Building Size: 257,784 sq. ft.
Project Cost: $78.9 million
New fire station and separate logistics support center
New four-story Residential Facility
193,424 square feet and 740 beds
Old Dominion University is rebuilding and expanding S.B. Ballard Stadium to enhance seating and add modern amenities. $65 million phase 1 project.
The UNC Hillsborough Bed Tower II project is a four story 96,000 sf bed tower addition to UNC Healthcare’s Hillsborough Campus.
BIM Modelers contact
520 South Independence Boulevard, Virginia Beach, Virginia 23452, United States
Open today | 08:00 am – 05:00 pm |
Copyright © 2019 Virtual Construction Technologies, LLC - All Rights Reserved.